Project Components

Component 01

Watershed and Water Resources Planning - US $13.7Mn

Sub Components

    • 1.1 Watershed Management Planning

    • 1.2 Watershed restoration

    • 1.3 Multi-sector water resources planning

 

Watershed Management Planning  (US $5Mn)

Will help to develop a Watershed Management Plan for the upper Mahaweli watershed through a consultative approach, with activities to be implemented at mini-watershed levels.

Watershed Restoration (US $1.5Mn)

Plans to enhance community livelihoods using technically sound methods delivered in a socially, institutionally, and environmentally inclusive manner. Initially budgeted under GoSL funds, this component was revised and reallocated under IDA funding.

UPDATE

Under  this sub-component 1.2, essential projects required for the protection of sensitive watershed areas in the Kandy, Nuwara Eliya, and Badulla districts ( which are considered high Upper Mahaweli catchment areas ) —were identified and implemented in collaboration with the respective District Secretariats and the Department of Forest Conservation.

 

DistrictImplementing AgencyNumber of ProjectsCost (Rs. Mn)
KandyKandy District Secretariat2080
KandyDepartment of Forest Conservation98
Nuwara EliyaNuwara Eliya District Secretariat1561
Nuwara EliyaDepartment of Forest Conservation168.5
    
  1.  Subcomponent 1.2: Watershed Restoration

This subcomponent will be implemented within the Upper Mahaweli Watershed, with the objective of demonstrating a scalable approach that can be replicated in adjacent watersheds in the future. The subcomponent will finance the works, goods, and services required to implement prioritized on-farm and off-farm Watershed Management (WSM) activities identified in approved Mini WSM plans. These interventions aim to restore the hydrological and ecological functioning of the watersheds while enhancing the sustainability of existing land-use practices.

  • Phase 1 Implementation (Pilot Project)

Phase 1 will be carried out in four Divisional Secretariat Divisions (DSDs) selected through a priority analysis conducted by MASL and LUPPD.

A total of 26 mini-watershed management plans will be implemented under Phase 1, including 6 plans in Patahewaheta, 4 in Delthota, 9 in Hanguranketha, and 7 in Mathurata.  (Figure 1)

 

Multi-Sector Water Resources Planning (US $7.7Mn)

a. Enhancing bulk water allocation model & expanding HMIS Network

Strengthen and enhance the existing bulk water management model (VISTA Model at WMS-MASL) and expand the existing Hydro-Meteorological Information System (establishing 120 new stations for MASL & ID).

b. Groundwater Management

Support for the water resource board (WRB) in the development of knowledge-based integrated groundwater management basin plans in eight pilot basins.

•  Malwathu Oya
•  Deduru Oya
•  Kumbukkan Oya
•  Mathuru Oya
•  Mee Oya
•  Maa Oya
•  Kelani Basin
•  Jaffna Peninsula

 

Issues in Upper Mahaweli Watershed and proposed solutions

IssuesSolutions

   •  Deforestation, encroachment and forest fires 
       in the forest areas in the catchment

   •  On-farm as well as off-farm soil erosion 
       leading to reduced land productivity

   •  Increased silt in river water which causes 
       siltation of reservoirs (and reduces their life 
       span) while turbidity creates problems for 
       drinking water supply & electricity generation

   •  Reduced water flows from the catchment 
       to the Mahaweli river affecting drinking water 
       supply & electricity generation

   •  Poor quality of Mahaweli water (inorganic 
       pollutants) create problems for drinking 
       water supply & electricity generation

 

   •  Reforestation of degraded forest lands and 
       degraded plantation lands. 

   •  Establishment of soil conservation measures
       (on-farm and Off-farm)

   •  Rehabilitation of abandoned small tanks in 
       UMW.

   •  River bank conservation.

   •  Home garden development.

   •  Livelihood development.

Achievement of Project Deliverables