Sub Components• 1.1 Watershed Management Planning • 1.2 Watershed restoration • 1.3 Multi-sector water resources planning |
Will help to develop a Watershed Management Plan for the upper Mahaweli watershed through a consultative approach, with activities to be implemented at mini-watershed levels.
Plans to enhance community livelihoods using technically sound methods delivered in a socially, institutionally, and environmentally inclusive manner. Initially budgeted under GoSL funds, this component was revised and reallocated under IDA funding.
UPDATE
Under this sub-component 1.2, essential projects required for the protection of sensitive watershed areas in the Kandy, Nuwara Eliya, and Badulla districts ( which are considered high Upper Mahaweli catchment areas ) —were identified and implemented in collaboration with the respective District Secretariats and the Department of Forest Conservation.
| District | Implementing Agency | Number of Projects | Cost (Rs. Mn) |
| Kandy | Kandy District Secretariat | 20 | 80 |
| Kandy | Department of Forest Conservation | 9 | 8 |
| Nuwara Eliya | Nuwara Eliya District Secretariat | 15 | 61 |
| Nuwara Eliya | Department of Forest Conservation | 16 | 8.5 |
This subcomponent will be implemented within the Upper Mahaweli Watershed, with the objective of demonstrating a scalable approach that can be replicated in adjacent watersheds in the future. The subcomponent will finance the works, goods, and services required to implement prioritized on-farm and off-farm Watershed Management (WSM) activities identified in approved Mini WSM plans. These interventions aim to restore the hydrological and ecological functioning of the watersheds while enhancing the sustainability of existing land-use practices.
Phase 1 will be carried out in four Divisional Secretariat Divisions (DSDs) selected through a priority analysis conducted by MASL and LUPPD.
a. Enhancing bulk water allocation model & expanding HMIS Network
Strengthen and enhance the existing bulk water management model (VISTA Model at WMS-MASL) and expand the existing Hydro-Meteorological Information System (establishing 120 new stations for MASL & ID).
|
b. Groundwater Management Support for the water resource board (WRB) in the development of knowledge-based integrated groundwater management basin plans in eight pilot basins. • Malwathu Oya |
| Issues | Solutions |
|
• Deforestation, encroachment and forest fires • On-farm as well as off-farm soil erosion • Increased silt in river water which causes • Reduced water flows from the catchment • Poor quality of Mahaweli water (inorganic
|
• Reforestation of degraded forest lands and • Establishment of soil conservation measures • Rehabilitation of abandoned small tanks in • River bank conservation. • Home garden development. • Livelihood development. |
Achievement of Project Deliverables
Component 1